Chemical Engineering Portfolio
Major Projects and Activities from 1993 to Present
TERMINALS PTY LTD:
Employed as Engineering Manager with responsibilities
for Capital Projects at both Coode Island and Geelong sites and some Capital
Project responsibilities at the Adelaide site. Responsible for all maintenance
activities at Coode Island.
|
| Back to top |
CSL BIOPLASMA:
Employed on hourly rate contract basis as a consulting
engineer to project manage various capital works. This involves managing
projects from conceptual design (and some detail design) through to construction,
commissioning and handover to production.
|
| Back to top |
W R GRACE AUSTRALIA LTD:Employed on hourly rate contract basis as a consulting engineer to project manage various capital works. This involves all aspects of each project from conceptual design (and some detail design) through to construction, commissioning and handover to production.MAJOR PROJECTS New Mixing Plant (Construction Products Division): Design and project management of a new concrete admixture plant involving two 10KL mixing vessels. The mixing tanks are on load cells that are interfaced to a process controller that stores recipes, scales ingredients to batch sizes and adds bulk liquids automatically. Included in the scope are new material handling and dust suppression equipment for bagged powders.Cleaner Production: Direct piping of a number of solvents from underground storage tanks to eight printing presses and provision of peristaltic pumps for ink delivery to the presses. The main aim of this project is to reduce solvent emissions. Cost: $200K.Solvent Mixing Room: Construction of a dangerous goods store for class 3.1 liquids and design and project management for a new primer/adhesive mixing process. Cost: $150K.Waste Water Recycling: Design and project management of a water recycling system for Grace Construction Products plants in Sydney and Melbourne. Cost: $120K.Bulk Storage Tanks: Design and project management of two 15,000 litre and one 45,000 litre bulk storage tanks for Grace Construction Products. Cost: $80KRotary Vacuum Drum Filter: Investigated poor performance of existing scraper discharge unit and recommended conversion to a pre-coat type. Conducted pilot plant tests to prove the concept and subsequently managed the project through to completion. Cost $70K.Vacuum Batch Mixer: Design and project management of an agitated, jacketed vacuum batch mixing tank on load cells. This included design of a jacket water temperature control system. Cost $90K.Chilled Water Piping: Project management of new filter installation and replacement of corroded gal piping with ABS on a chilled water circuit. Cost $90K.Solvent Tanks Overflow Protection: Selection and implementation of ultrasonic high level alarms for four bulk solvent storage tanks and recommendations for further work to prevent overfilling. Cost $40K.Die Retrofit: Project management of new die installation on an existing plastic film extrusion and laminating machine. Cost: $300K.Upgrade of Bulk Caustic Facility: Upgrade of Bulk Caustic facility in Construction Products Plant in Sydney. Replacement of unloading and delivery piping and general upgrades to conform with the Dangerous Goods Regulations. Cost: $30K.Miscellaneous Material Handling Projects: Various small material handling projects utilising mechanical lifting equipment such as:
|
| Back to top |
CHEM ENG CONTRACTS PTY LTD:
Employed on hourly rate contract basis to perform
process design and project management services to a wide variety of clients.
Duties included liaising with clients, preparation of P&ID’s, equipment
lists and specifications, engineering calculations, cost estimates, instrument/electrical
control functional specification, quotations, construction supervision
and commissioning.>
|
| Back to top |
MISCELLANEOUS CLIENTSITW FLUID POLYMERS PTY LTD Bulk Liquid Storage and Delivery System: Preliminary design, specification and budget cost estimate for a 30,000 litre bulk storage tank and delivery system. Estimated Cost: $150K.PARKS VICTORIA - MACEDON RANGES REGION Preparation of two binders containing MSDS’s of all chemicals stored on site (Macedon Depot). Project scope included the following:
VISY PAPER PTY LTD Coatings Plant: Tender specification documents and tender evaluation document for two bulk agitated stainless steel storage tanks and a stainless steel high shear mixing vessel. Cost: $100KSNF (AUSTRALIA) PTY LTD Polymer Mixing and Dosing Rig: Organised repair of polymer mixing and dosing rig. Received the job on 31/12/97 and had the rig repaired, tested, commissioned and shipped to customer by 8/1/98.Polymer Mixing and Dosing Rig: Received the above rig in a poor state of repair after use by an SNF customer. Extensively refurbished rig including equipment repairs, painting, testing and commissioning.JOHNSON MATTHEY (AUSTRALIA) LTD Silver Nitrate Plant: Process trouble shooting and commissioning assistance on new silver nitrate plant. Carried out literature search to provide assistance to J/M staff to solve trace metal quality problems. Plant now runs successfully and J/M have supplied photographic quality silver nitrate to Kodak since 1996.VANTICO PTY LTD (FORMERLY CIBA SPECIALTY CHEMICALS PTY LTD) Ventilation and Extraction System Upgrade: Design and Project Management of upgrade to ventilation exhaust air and fume extraction in the Production area. Cost: $65KReplacement Boiler: Investigation, requirements specification, tender specifications, tender evaluation document, tender interviews and project management of new 500 kW boiler to replace existing electric boiler. Cost: $80KAdhesive Mixing Plant: Process trouble shooting to solve a temperature related process problem involved in the production of adhesives in an agitated, jacketed pressure vessel. Included the design and AS1210 calculations for the pressure vessel.Vessel Bunding: Determined requirements and project managed concrete bunding for a 50,000 litre storage vessel. Cost: 30K.Agitator Replacement: Determined requirements and project managed replacement agitator for process reactor. Cost: $15K.Cooling Tower: Assessment of cooling water loads and sizing of tower. Specification for tower and tender selection. Sizing of pump. Project management and commissioning. This project was implemented as a turnkey. Cost: $30k.Minor Projects: Numerous minor projects and process investigations. SANDHURST DAIRIES BENDIGO New Yogurt Line: Designed and specified steam and chilled water services for new process plant.Dangerous Goods: Designed and specified new facility for bulk caustic soda and bulk phosphoric acid storage and supply facility with respect to Dangerous Goods Regulations.Chilled Water System: Carried out audit and process capability study on factory chilled water system and made recommendations to optimise system.NOTE PRINTING WORKS Waste Treatment Plant: Preliminary investigation into status of waste treatment plant with respect to EPA and water authority.Dangerous Goods: Preliminary design brief on upgrade requirements to satisfy dangerous goods regulations. |